An increase in enrollment was observed with the introduction of free Basic education. This development required additional educational facilities to meet the rising need at the Baiden Walker Experinmental JHS in Abura Dunkwa. An additional 3-unit classroom block was provided to accommodate the growing population of the school. The school now has two streams running […]
Daily Archives: February 26, 2021
Construction of 2-unit KG Block with office and washrooms for New Ebu Catholic school
The project was undertaken to provide infrastructural support for the New Ebu Catholic School. The project commenced on 22nd May 2020 and was completed on 27th November 2020. The work comprises the provision of two (2) classrooms, an office, a bathroom and a toilet. The facility was put to use after students returned from the […]
Construction and Furnishing of 2-Bedroom Flat for Asuansi CHPS Compound
To improve health care delivery for the Asuansi CHPs zone, a 2-Bedroom furnished flat has been put up for health care providers. The work comprises the provision of residential accommodation and provision of bedroom furniture. The work commenced on 22nd May 2020 and was completed on 13th July 2020. The facility was commissioned for use […]
Construction of 2-unit KG with office and washrooms at Essandohkrom
The project was undertaken to provide infrastructural support for the Essandohkrom Basic School. The project commenced on 21st October 2019 and was completed on 20th January 2020. The work comprised the provision of two (2) classrooms, an office, a bathroom and two toilet units. The project was commissioned for use by Hon. Elvis Morris Donkoh […]
Construction of 900mm x900mm Culvert and 1.3KM access Road from Mankensu Junction to Link Abura Dunkwa-Srafa Feeder Road (Aburaman SHS Bypass)
The project was undertaken with the objective of creating an alternative road from Abura Dunkwa to Srafa. The aim was to divert vehicular movement from the Aburaman S.H.S by creating a By-pass to ensure an undisturbed serene environment for the activities of the School.The work comprised the opening- up and shaping of 1.3km road, construction […]